Hello Everyone,
Just wondering how many times is it acceptable to ask them to fix the same leaks after resurfacing the pool/jacuzzi? My Jacuzzi is leaking water by the light fixture, at first the contractor told me he couldn't find the leak, I had to do a leak test myself and found the leak. Showed them where the leaks were and already had them come out 2 times to fix it, but still leaking. What is upsetting is that I don't even see them doing a leak test after filling up the water to see if it's fixed, shouldn't that be standard for that type of repair? The one under the coping can be seen from the other side as soon as the water hits the coping line. Also is the plaster variation on the seat from a poor acid wash job?
At what point should I start deducting from final payment due to all the water wasted and time I'm putting into this so they can fix their mistake?
Just wondering how many times is it acceptable to ask them to fix the same leaks after resurfacing the pool/jacuzzi? My Jacuzzi is leaking water by the light fixture, at first the contractor told me he couldn't find the leak, I had to do a leak test myself and found the leak. Showed them where the leaks were and already had them come out 2 times to fix it, but still leaking. What is upsetting is that I don't even see them doing a leak test after filling up the water to see if it's fixed, shouldn't that be standard for that type of repair? The one under the coping can be seen from the other side as soon as the water hits the coping line. Also is the plaster variation on the seat from a poor acid wash job?
At what point should I start deducting from final payment due to all the water wasted and time I'm putting into this so they can fix their mistake?