Our pool was finished in December. We have a section of the concrete deck that slopes down from the pool then back up before the microdrain. Water stands there a good while after rains and swimming. It's kind of annoying that the slope of the deck wasn't done right.
Is this normal variations in concrete work or should I push PB to fix as part of our one year "bumper to bumper?"
Is this normal variations in concrete work or should I push PB to fix as part of our one year "bumper to bumper?"