I have a contractor building my pool at the moment. We're about 90% done at this point, but after pouring concrete, installing the liner and filling up the pool, we've noticed a 2" water level different in one of the corners.
We have a pretty big hill that the pool sits on. The corner that is uneven is on the largest portion of a retaining wall, which would definitely be considered the weakest corner.
We haven't even had the final inspection due to the contractor not completing the grading of the yard and covering up the electrical. We noticed the uneven level of the water as soon as the pool was filled up. The contractor has pushed back saying that he can't control leveling, but it's not like this has happened a year down the road. This happened day one.
Any advice on making sure the contractor fixes the issue and making sure he does it correctly this time?
I've attached the image of the back corner. This was right after concrete was poured.
We have a pretty big hill that the pool sits on. The corner that is uneven is on the largest portion of a retaining wall, which would definitely be considered the weakest corner.
We haven't even had the final inspection due to the contractor not completing the grading of the yard and covering up the electrical. We noticed the uneven level of the water as soon as the pool was filled up. The contractor has pushed back saying that he can't control leveling, but it's not like this has happened a year down the road. This happened day one.
Any advice on making sure the contractor fixes the issue and making sure he does it correctly this time?
I've attached the image of the back corner. This was right after concrete was poured.