I am in the process of replacing a 14 year old AGP. I spent most of today working on setting pavers for under the uprights. There weren't any before. These are now all leveled - front to back, side to side, and laser leveled with each other.
There are now places that have an one inch gap under the bottom rails between the pavers.
Is there some fix for this so I don't have to resign the other 15 pavers? Would it be possible to fill the gap with some pressure treated lumber? Or just pack in some soil??
Need help.

There are now places that have an one inch gap under the bottom rails between the pavers.
Is there some fix for this so I don't have to resign the other 15 pavers? Would it be possible to fill the gap with some pressure treated lumber? Or just pack in some soil??
Need help.

