I excitedly got a pool and I did watch videos to install on leveling, but I was putting mine on my concrete slab in the backyard that I didn't realize was sloped. Looked flat to me lol! I was doing this on my own I just figured the top needed to be level..so I put 3 inch concrete pavers on the low side and used my level all around the top...building the pool up on one side its about 3-4 inches off still....I now know how stupid that was. I just want it to last this summer. Should I leave it be or will taking the pavers put mess the pool up?