I'm going on a vacation. I plan to shock my pool to 11ppm from where it is now so that the CL will not drift too low while I'm gone. The Pool Calculator says I need to add 169 oz. to raise the CL level to 11. Can I do this all at one time, or do I need to do it over a couple of days?
Thanks, Mike
Thanks, Mike