how long will fill water last without chemicals

HAPPY MEMORIAL DAY!
Thursday:
Changed liner
Friday: started filled pool
Saturday: still filling pool (water on slow because we had lots of commitments going on)
Sunday:
Finished filling found leak in return piping
drained down fixed leak(so we hoped)
refilled
Monday: (today)
refilled started pump still leaking
AS OF NOW I HAVE NOT ADDED ANY CHEMICALS
Question: Should I drain down fix leak and add chemicals or
should I add chemicals run a while before draining 4 or 5 inches of water to fix leak
 
In your area, I would suggest adding some chlorine to the water before you drain down again. Just 3 ppm FC worth. May not be needed, but good insurance.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.