We are at the Gunite phase and the PB i casually mentioned the back of the pool will need to be dug out because they didn’t know the ground was slightly higher than the front of the pool. They said they would dig a V and I would need to install drains to the street eventually. It seems an easier fix would be to raise the wall in the back but they want to charge me because they are saying it was not in the original design. I am not a pool designer so would expect them to advise what is required. What do you suggest as the best fix ? Common sense is telling me digging a ditch is going to be a mess whenever it rains.