- Jun 10, 2009
- 336
- Pool Size
- 24000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
Hi All,
As some of you may know I have a new quartz finished pool that has been filled up for about 4-5 weeks now. All chemicals are balanced out pH, and chlorine are 7.5 & 3ppm.
We leave for vacation tomorrow for 9 days. I take care of the pool myself and so I have nobody else who can check it while I'm gone. My pool has a SWG. Is there something I can do such as lower my PH and turn my SWG up to 50 while I'm gone to be sure all stays OK?
My pool builder said to drop my PH to 7.2 and turn my SWG up to 50% I'm in central California and luckily the weather will be mild while we are gone like mid 80's only getting to 91 the last 2 days before we return.
Any advice? Thank you!
As some of you may know I have a new quartz finished pool that has been filled up for about 4-5 weeks now. All chemicals are balanced out pH, and chlorine are 7.5 & 3ppm.
We leave for vacation tomorrow for 9 days. I take care of the pool myself and so I have nobody else who can check it while I'm gone. My pool has a SWG. Is there something I can do such as lower my PH and turn my SWG up to 50 while I'm gone to be sure all stays OK?
My pool builder said to drop my PH to 7.2 and turn my SWG up to 50% I'm in central California and luckily the weather will be mild while we are gone like mid 80's only getting to 91 the last 2 days before we return.
Any advice? Thank you!