Hello. I am about to leave for 10 days and won't be able to add chemicals while away. Here are our current readings:
FC 5 (We usually keep between 7-9)
CC <0.5 (usually stays at 0, but we had a LOT of people in there for over 5 hours Monday, plus rain since then)
pH 7.5 holding steady
TA 130 (haven't lowered since pH is not bouncing around--is this ok?)
CH 250
CYA 60
I just added 3 Gallons of 10% chlorine which should raise it to 27. It seems to go down faster when there is more FC. Is there a ratio or something? Will this last me 10 days? Or will someone need to add some more Tues/Wed? I don't really want anyone else messing with the chemicals, but I can have someone add once or twice while I am away if needed. I know we will need to brush and vacuum when we return, but I don't want the green mess. Looking back over the last couple weeks, it looks like we've used around 2-5 per day. It looks like we definitely use more on sunny days than cloudy, and more when lots of people are using it.
Any help is appreciated. Thanks!
FC 5 (We usually keep between 7-9)
CC <0.5 (usually stays at 0, but we had a LOT of people in there for over 5 hours Monday, plus rain since then)
pH 7.5 holding steady
TA 130 (haven't lowered since pH is not bouncing around--is this ok?)
CH 250
CYA 60
I just added 3 Gallons of 10% chlorine which should raise it to 27. It seems to go down faster when there is more FC. Is there a ratio or something? Will this last me 10 days? Or will someone need to add some more Tues/Wed? I don't really want anyone else messing with the chemicals, but I can have someone add once or twice while I am away if needed. I know we will need to brush and vacuum when we return, but I don't want the green mess. Looking back over the last couple weeks, it looks like we've used around 2-5 per day. It looks like we definitely use more on sunny days than cloudy, and more when lots of people are using it.
Any help is appreciated. Thanks!