Looks great. I know how you feel about just wanting the project to end. Looks like you are getting pretty close. Do you have a plaster date yet?
No plaster day yet, they are supposed to finish the last little bit of tile today (they didn't order enough of the edge tiles). thankfully, I was able to get Lightstreams to send some to me expedited. I needed 24 pieces of the 90 degree bend and they only had 30 in stock. I got lucky. typically those are 100% custom made, they just happened to have some in stock.
Today they are finishing the tile (all 15' of it that's left) and the back beam and scuppers. Then it's clean up and plaster.
I'll say I'm so tired of looking at it, just want it done.
Your project looks GREAT!
We are considering changing to Travertine decking based on your build.
Frisco is a good place to live, judging by your pictures we could be neighbors!!
How has everyone been OK with that pile of trash in the pool? I know that's pretty typical but I can't say I've seen anything that bad.
That's not your job to police that but that sure is a testament your contractors work ethic.
Your raised wall in the back, is there a reason you used block instead of gunite? I am going with a 8 ft 18" raised wall with a water feature. The front will be glass tile, just wondering what would work the best in making sure the tiles don't crack. Going with a modern look with the tile even with the waterline tiles.
So much pretty blue in one place!!!!! Oh happy day!!
Kim![]()
Son and nephew decided to jump in just as it was finished filling. Crazy as it was freezing. they lasted about 5 minutes.