Just curious, does the freeze protection take precedence over any schedules? Ashed another away, if the circuit is not defined as “freeze protection ON” and the freeze protection is ON will that circuit not come on even if it is on the schedule. For instance, this morning my Spillway is set to come on based off my everyday schedule. It is defined in circuits as Freeze Protection OFF. The freeze protection came on as it was 30 deg this morning however my spillway never came on. I’m assuming this is why?