We are getting close to dig day. The HOA finally approved the pool and the permits have been filed. We met with the pool builder Saturday and went over more of the details. I don't have model numbers but it will all be Jandy equipment. I am upgrading to the variable speed pump and a saltwater setup. The pool is 7,600 gallons from my research. It looks like 1 skimmer and 3 returns but he said that Viking installs all that so we really didn't get into it. He did say that the house was too tall and it would require a bigger crane or we could just remove more of the fence. I was hoping to just remove 2 or 3 sections but looks like most of one side will come down. We planned on putting a welded wire on the fence to bring it up to code but since a lot will need to be reinstalled we are getting quotes for a 5 foot fence now. The whole yard will have to be re-graded as well. I didn't plan for that so now we are trying to figure out if we want to hydro-seed, re-seed, or put down sod. I also have to re-do 2 zones for the irrigation system. The wife wants to line the side fences with shrubs for privacy, we found one (Emerald Green Arborvitae) that we really so we are trying to figure that out as well. The dig day is next Monday, Aug 12th. He said Tuesday the pool will be in the ground. Wednesday the electrician will be out. Thursday will be the electrical inspection, Friday will be grading, and the following week will be pouring of the patio. The one thing that we aren't excited about is we leave for vacation bright and early that Friday morning and wont be back till Tuesday night. He said he's planning a 10 day build.