In the SLAM process after doing a partial drain and refill to get CYA down from 200+ to 55. I had the wrong CYA plugged into the calculator and added 5 gallons of % bleach initially which should have raised FC to about 39, however after 24 hours and several attempts to get a FC reading I cannot get the sample to go clear. I stopped at 120 drops which would be 60 PPM (?) because it didn't make sense based on the calculator. The pool has improved visibly in a day and I've cleaned dead algae out of the filter twice, but I haven't added bleach yet since I can't get a measurement. Wondering if i'm missing something?
Full results when I started were:
FC: 0
CYA: 55
TA: 80
PH: 7.8
CH: 175
Also wondering if I need to be concerned about the low CH or any other levels?
Full results when I started were:
FC: 0
CYA: 55
TA: 80
PH: 7.8
CH: 175
Also wondering if I need to be concerned about the low CH or any other levels?