I am having him cut in an expansion joint between the house and the patio because his crew forgot to install one against the house. Otherwise no, they installed what appears to be 1/2 inch wide by 3/4 deep plastic strips at 8 feet on center but they do not go through to the ground.
My understanding is that there is a break between the coping and the concrete but I can’t be certain as they installed the foam spacer and poured the same day.
Thank you for your input!