My PB had pool excavated days before kit deliver. Pool sat several days between wall assembly and inspections. We kept getting bumbed for other jobs too. During the past two weeks we have had monsoon rain causing pool walls to sink in and cave in many areas. What used to be a 7 foot perfectly excavated pool has turned into what looks like a 5 foot mud puddle.
Pb says we need to get excavator back in to redig and reshape pool and fill with rock bed. This is costing an additional $1500. He offered to split cost with us but I feel like it's not my responsibility as he managed his construction timeline and didnt work here on several very beautiful days high 90 and no rain.
Thoughts or experience on this?? Also we did not hit ground water this is due to rain only.
Pb says we need to get excavator back in to redig and reshape pool and fill with rock bed. This is costing an additional $1500. He offered to split cost with us but I feel like it's not my responsibility as he managed his construction timeline and didnt work here on several very beautiful days high 90 and no rain.
Thoughts or experience on this?? Also we did not hit ground water this is due to rain only.