I am converting my pool from baquacil to chlorine and because of that I am thinking of doing a partial drain to get the phmb levels down before I start. On one shortside of the pool I got four steps down into the pool. Is there anyone who knows if there are any risks with that. When the pool was build they put weights on the steps to hold the liner down. Is this something I also need to do when I drain?