Re: We started our build - Pasadena, CA
Weeks 9 & 10
It looks like next week is go time! Fingers crossed we are allowed to do the plaster next week. It all depends on the inspector’s findings tomorrow during the pre-plaster inspection. We will see.
This past week saw the completion of the perimeter wall fix with a wrought iron specialist reinforcing the existing walls by cementing posts every 30” along the worse of the 2 walls, and including a dotted metal screen above for privacy. They also installed some of the rods around 2 diagonal cracks on the other wall as instructed by the city’s supervising plans check engineer. It doesn’t look horrible, I guess. LOL. My hubby and I will paint the block wall white and then the privacy trees will be planted in front of the back wall. We changed our plans for the side wall and instead of privacy trees we want to install a cheap white vinyl wall in front of the block wall. We think it will look cleaner and we don’t want to provide a home for the critters (i.e., birds, lizards, squirrels, spiders, etc.). In front of the vinyl wall we can place a few potted plants.
Our overhead electrical line was relocated from behind the house to behind the garage and the electrical was completed on the pool and spa. They also installed the remote device inside the house so we can operate the pool and spa without having to go outside. Yippee! But, they weren’t able to get the city’s power and water dept to meet them on site for the overhead electrical line and that means the city hasn’t brought out our new meter yet (part of their process when upgrading panels – not moving the overhead line). That’s great because we are getting free electrical until they bring out our new meter. But not so great because the city sent us a letter saying they were going to shut off our electricity if we don’t get the meter back on within a certain time period that is quickly expiring. I’m sure this is going to be a headache… but free electricity in the meantime will make it worthwhile!
The other thing that was accomplished this week is the vinyl gate was installed. We opted for a high quality gate (read: expensive) because we have a cheaper one from Home Depot in the back of the house which is really weak. This darn gate cost us $955, and although it’s solid and we definitely like that, it has a ridiculous locking mechanism. It’s a key-latch that requires a key to lock/unlock from either side. So you need a key when you go into the backyard from the house, which is annoying. The worst part is that the mechanism and hinges are on the outside of the gate so I’m worried our security is compromised, and it can’t simply be reversed due to the design. I’m hopeful our PB will find a solution for us. For $955… I mean, come on.
We also got the ledger stone installed on the outside of the spa (I love it!!!), and the trim tile installed on the steps of the pool and spa. Oh my gosh, I didn’t know I was going to love ledger stone so much. Now I just want to have them build 2 curved planters made with matching ledger stone on either side of the garage door in the backyard right now. But, that’s not part of our build and we will have to wait for the planters and building out the patio area. Darn!
I hope my next post is telling you the plastering is done! Speaking of which, our PB is suggesting we just go with regular plaster, not quartz plaster, because he doesn’t think it’s worth the value. He’s always been hesitant about the quartz. We are doing just a white color and he feels going with quartz for white won’t give us anything. No sparkle like you’d see with a color finish. We don’t like pebble, we don’t want a color finish, and we were going with quartz because we’re told it lasts longer than basic plaster. But upon his recommendation this week, we are just going with a white plaster. Any last minute thoughts on that? PB said the life of the plaster really depends on the maintenance of the pool, and we do maintain our home and belongings so hopefully we get at least 15 years out of it. That’s the argument we used to convince ourselves to just go with plaster afterall but I’m a bit nervous about it.
http://
http://
http://

(Overhead electrical line on the ground! Yikes. And wrought iron guy nearby just working away on the wall.)
http://
(The fix is done. The loose blocks were reattached, mortar filled in the cracks, and the wrought iron reinforced the walls. So much better than having to replace those 2 shared walls. Hope this gets the green light during inspection.)
http://
http://
(Lock & door hinges are on the exterior of the gate. No bueno.)
http://
http://