Hey everyone,
I am opening my 14'x42" 3,512gal pool and I was wanting to know if I should wait to add the liquid bleach (plain, generic brand, 6%) after 24 hours of adding stabilizer or add them together. I bought the Clorox Chlorine Stabilizer powder.
I still have a bit of dirt and sludge that I'm trying to vacuum out, but once I get most of it removed I plan on adding the recommended amount of stabilizer and chlorine based off of Pool Math. I don't have a very good test kit and I can't get one of the recommended ones for a few weeks, so it may be rough going for a bit. I have a liquid HTH out from Walmart for the time being. I drained all but about .5" of water from the pool, so I'm almost starting over.
I am opening my 14'x42" 3,512gal pool and I was wanting to know if I should wait to add the liquid bleach (plain, generic brand, 6%) after 24 hours of adding stabilizer or add them together. I bought the Clorox Chlorine Stabilizer powder.
I still have a bit of dirt and sludge that I'm trying to vacuum out, but once I get most of it removed I plan on adding the recommended amount of stabilizer and chlorine based off of Pool Math. I don't have a very good test kit and I can't get one of the recommended ones for a few weeks, so it may be rough going for a bit. I have a liquid HTH out from Walmart for the time being. I drained all but about .5" of water from the pool, so I'm almost starting over.