Hello!
This is a great forum and I am learning a lot about pools!
I just wanted to share our pool build experience. We built the pool ourselves. It is a traditional vinyl liner pool and is what is typical for our Northern Ontario location. It is a 36 x 18 foot L with a 10 x 14 shallow end. It was fun to build - mega work with the shovel and concrete....and we are still doing some work on it
.
After choosing the pool style, getting permits and planning for the dig it was go time in September last year. To rent the excavator was about $1200 for a week, plus fuel and float. My awesome wife made some calls and found a nice guy who wanted work and had done lots of pool digs - his cost all in was $1100 to dig the pool - done in a day. I did the lay out with my buddy and set up the grades - The Excavator brought his own guy to help on the dig - WOW and the assistant ran the transit I had set up - I was able to then co-ordinate a gravel delivery and moving the top soil.




Just finishing the hole. After the guy left it started raining - time to drop in gravel....
More to come......
This is a great forum and I am learning a lot about pools!
I just wanted to share our pool build experience. We built the pool ourselves. It is a traditional vinyl liner pool and is what is typical for our Northern Ontario location. It is a 36 x 18 foot L with a 10 x 14 shallow end. It was fun to build - mega work with the shovel and concrete....and we are still doing some work on it
After choosing the pool style, getting permits and planning for the dig it was go time in September last year. To rent the excavator was about $1200 for a week, plus fuel and float. My awesome wife made some calls and found a nice guy who wanted work and had done lots of pool digs - his cost all in was $1100 to dig the pool - done in a day. I did the lay out with my buddy and set up the grades - The Excavator brought his own guy to help on the dig - WOW and the assistant ran the transit I had set up - I was able to then co-ordinate a gravel delivery and moving the top soil.




Just finishing the hole. After the guy left it started raining - time to drop in gravel....
More to come......