Hi all! I am beginning the process of building a small-ish (12x28) cement black pool without a liner. I’m going back and forth on a flat bottom or gentle slope to deep end. So far I have dug most of the hole myself and it’s been strangely therapeutic. Cheaper than therapy in these crazy stuck at home times lol.
I do have a backhoe coming next week to finish it out. My question right now is on footings. It seems there is conflicting advice on pouring the floor and footing together or pouring the footing then starting up the walls and pouring floor after. Any experience or thoughts? Thanks so much!!