day 5 since filling and the pool company came to begin their magic on the water. (They manage the water for the first 30 days.)
I was not here when they came, but I can tell they backwashed the filter, added chlorine (probably a tablet through the feeder) and likely did something to begin lowering the pH.
My pebble aggregate is embedded in a sky blue plaster base and the pool water is now a very cloudy sky blue. This seems to be from plaster dust in the water.
I had tested my fill water once the pool was filled and posted those results earlier here. Today, I tested again and tested everything. Here ya go:
FC 4.5
CC 0
pH 8.2 Even though it registered 8.2, it was closer to the 8.2 color than the day I filled.
TA 340 (!)
CH 50
CYA 0 The solution in the cylinder was perfectly clear like water even when all the way full.
Thoughts?
I was not here when they came, but I can tell they backwashed the filter, added chlorine (probably a tablet through the feeder) and likely did something to begin lowering the pH.
My pebble aggregate is embedded in a sky blue plaster base and the pool water is now a very cloudy sky blue. This seems to be from plaster dust in the water.
I had tested my fill water once the pool was filled and posted those results earlier here. Today, I tested again and tested everything. Here ya go:
FC 4.5
CC 0
pH 8.2 Even though it registered 8.2, it was closer to the 8.2 color than the day I filled.
TA 340 (!)
CH 50
CYA 0 The solution in the cylinder was perfectly clear like water even when all the way full.
Thoughts?