Hello,
I am on the PNW, near Seattle, WA. I have a pool and a spa and am trying to get both replastered and retiled.
So far, I have a quote at $30k usd for this work, it's not a full chip out, they will chip out below tile, around fixtures, around the drain, perform a sound check(?) and chip put any places where they detect the old plaster has delaminated from the pool.
It's a concrete pool, rounded rectangular with a deep end and a shallow end about 22k gals and there is a separate spa at at about 1k gallons.
After reading through many quotes, mine seems insanely high, even for HCOL WA state. Anyone have current 2024 rates for this work? Also, I got this quote last year, but the contractor added 5% for increased material and labor rates. Are you all seeing this too?
Thank you, just trying to get a grip on this costly project.
I am on the PNW, near Seattle, WA. I have a pool and a spa and am trying to get both replastered and retiled.
So far, I have a quote at $30k usd for this work, it's not a full chip out, they will chip out below tile, around fixtures, around the drain, perform a sound check(?) and chip put any places where they detect the old plaster has delaminated from the pool.
It's a concrete pool, rounded rectangular with a deep end and a shallow end about 22k gals and there is a separate spa at at about 1k gallons.
After reading through many quotes, mine seems insanely high, even for HCOL WA state. Anyone have current 2024 rates for this work? Also, I got this quote last year, but the contractor added 5% for increased material and labor rates. Are you all seeing this too?
Thank you, just trying to get a grip on this costly project.