Had some quality control issues with our batch of pre-cast concrete coping (major chipping and coming loose from bond beam), so they are ripping out and re-ordering. But in the meantime they want to pour the concrete decking, then come back and re-install the new coping. Is that an ill advised sequence that's going to cause issues?