I am planning to disconnect my pump and filter, then form and pour a 24"X24" concrete pad probably about 4" in thickness.
I am wondering, while the concrete cures my pump and filter are not operational.
I know concrete takes 28 days to cure. But I do not think I can wait 28 days before running the pump and filter.
How many days do you think I can wait to put back the pump and filter, connect piping and run them? Is a week long enough?
I am wondering, while the concrete cures my pump and filter are not operational.
I know concrete takes 28 days to cure. But I do not think I can wait 28 days before running the pump and filter.
How many days do you think I can wait to put back the pump and filter, connect piping and run them? Is a week long enough?