- Mar 19, 2021
- 186
- Pool Size
- 15000
- Surface
- Vinyl
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-60
Getting mentally ready to close in a couple weeks or so.
The procedure is described in so much detail on this forum and elsewhere, thanks to so many of you.
Don't want to discuss the steps here yet again but wanted a thread to zero in on the sequence, and whether that matters.
Every post is slightly different in terms of the sequence of steps - some start with return side, then suction, then drain and disconnect filters/heater etc, while others disconnect and drain equipment first, then move to blow the lines in all sorts of different orders.
Is there a logic to the optimal sequence of steps? For instance, to me it seems logical to drain all equipment first before blowing return lines, but many seem to go the other way around.
Thank you!
The procedure is described in so much detail on this forum and elsewhere, thanks to so many of you.
Don't want to discuss the steps here yet again but wanted a thread to zero in on the sequence, and whether that matters.
Every post is slightly different in terms of the sequence of steps - some start with return side, then suction, then drain and disconnect filters/heater etc, while others disconnect and drain equipment first, then move to blow the lines in all sorts of different orders.
Is there a logic to the optimal sequence of steps? For instance, to me it seems logical to drain all equipment first before blowing return lines, but many seem to go the other way around.
Thank you!