My husband has these questions about installing the CircuPool SJ SWG in our setup.
I am attaching photos of the equipment pad and plumbing.
The instructions say: "The cell should be located above the highest plumbing point, and raised at least 6" from the return line."
He is unsure of what is meant by "above the highest plumbing point." Does that mean ALL the plumbing, because if so then it doesn't make sense to him. As you can see, there is plumbing higher (in elevation) than where the current chlorinator is, after the solar heater plumbing. We were thinking we would replace the existing chlorinator with the SJ-40. Will that work?
The other question is what is the length of the wiring between the cell and the control box. To put it where the chlorinator is, it probably needs at least 10 feet of length.
Thanks for your help. I emailed discount salt pool and got no reply and figured I’d get an answer here faster than calling the company.
I am attaching photos of the equipment pad and plumbing.
The instructions say: "The cell should be located above the highest plumbing point, and raised at least 6" from the return line."
He is unsure of what is meant by "above the highest plumbing point." Does that mean ALL the plumbing, because if so then it doesn't make sense to him. As you can see, there is plumbing higher (in elevation) than where the current chlorinator is, after the solar heater plumbing. We were thinking we would replace the existing chlorinator with the SJ-40. Will that work?
The other question is what is the length of the wiring between the cell and the control box. To put it where the chlorinator is, it probably needs at least 10 feet of length.
Thanks for your help. I emailed discount salt pool and got no reply and figured I’d get an answer here faster than calling the company.