I've had a leak in my system, that I definitely noticed last year, but seems worse this year.
I've been able to isolate the leak to the return lines.
In the short term, until I can get in to digging down to the return line on the shallow end, I thought I would make a temporary return line, which would involve about 25ft of 1 1/2" PVC (ABS is oddly super expensive at the moment), and 5 90 degree elbows.
Question I have for the end of temporary return line that goes into the pool, should I...
1) Put an eyeball on the end
2) Leave it open
3) Put a 1 1/2" to say 1 1/4" reducer to increase some velocity to get the water circulating?
I've been able to isolate the leak to the return lines.
In the short term, until I can get in to digging down to the return line on the shallow end, I thought I would make a temporary return line, which would involve about 25ft of 1 1/2" PVC (ABS is oddly super expensive at the moment), and 5 90 degree elbows.
Question I have for the end of temporary return line that goes into the pool, should I...
1) Put an eyeball on the end
2) Leave it open
3) Put a 1 1/2" to say 1 1/4" reducer to increase some velocity to get the water circulating?