Looking good!! Hopefully you will be swimming soon! We were in the same boat with rain and delays. Then when the deck got framed we had a week and a half of covered pool and no way to get in... You guys will be enjoying soon!Still needing the caps on the top, pump and filter hooked up, and backfill. Sighs... 2-3 day project going on 2-3 weeks! I do really like the color of the pool with the water in it...
- - - Updated - - -
It took too long and it's still not done lol. Between the rain delays and the pool guys rescheduling half of the time, it's been about 3 weeks now. However, probably only 3 days of full work...
Sent from my SM-G920V using Tapatalk