So the fiberglass shell was set on December 13th. And here we are over 4 months later. There was a two month delay for a missed (not even failed, just not called in) inspection which required the coping, the concrete surround and the waterfall wall be torn out and redone.
And now after going through that delay, I'm now going on 3 weeks while the pool company and the concrete deck guy bicker about who will do the last bit of grading (literally a few scrapes with a skidsteer) needed before forming for the deck.
So my backyard alternates between hard-pack rutted dirt and a giant mud pit while I wait to be able to bring in my landscaper for final grading and grass. UGH!!!!
But the pool is running! Of course it's also COLD.