They must be waiting for the dumpster trucks to come back...
I have all the experience of one half built pool...lol
Maybe the PB is getting more wood forms, other materials, or their foreman. As long as the subs weren't doing something shabbily or ignoring the plans, I let the PB or project manager handle work pace. He will easily know if there's any slacking going on. He has you scheduled for gunite in the morning, so he will want to keep that. It's beginning - so exciting! I was nervous over the dig. All that anxious energy MUST be why it all worked out,right?!Suz
I'm so nervous. Lol. Don't know why!
You know I was kidding right? Just figured I would help you channel your nervous energiesTM...did they install the ground water pressure meter before they started digging? Its typical for clay solis. Our digging had to be slowed down after they monitored that...
Awwww, TM - that's how most of us were! It's all that pent up waiting and dealing with details finally escaping like a pressure valve. You're doing great and on your way to a fabulous pool! :splash:
Suz :sunny:
TM...did they install the ground water pressure meter before they started digging? Its typical for clay solis. Our digging had to be slowed down after they monitored that...
Hello,
I'm just catching up on your thread and I came to this picture and got so excited for you all. Your pool is going to be amazing! Congrats!!
That Polo Assn. shirt is going to become a Water Polo Assn. shirt soon!
You know I was kidding right? Just figured I would help you channel your nervous energies![]()
You know I was kidding right? Just figured I would help you channel your nervous energies![]()
:lookhere: YOU, go to the corner right now!!
Poor TM! Phil, you had me going. I was thinking a million things at once. "I don't remember my PB doing that? I've never heard of it. Maybe he lives closer to the Gulf where the water table is higher. No, his build says Katy. Oh why didn't he just keep that to himself!"
Ok, I'm wise to you now!!That was a great one - so authentic!
Suz
LOVE the picture!
OH NO PHIL! You are in TROUBLE! Suz is a teacher! haha you got sent to the corner instead of me this time! LOL
Kim:cat:
- - - Updated - - -
TM got some home work for you:
get your tape measure ready. Have the plans on hand. AS soon as they leave measure EVERYTHING! It is THERE? (we had one forget the deep end bench) Is it deep, long, wide, etc enough? Add about 6 inches for the gunite and plaster. NOW is when to fix it if needed! IF they are willing measure it BEFORE they leave since they are shooting for early afternoon.
Kim:cat: