I've been reading many posts over the last few days and I want to thank all of you for your contributions. I have learned a lot (more like drinking from a firehose). And you can guess the reason? I picked up a used 16' Glen Cove (Wilbar brand I believe) and I've never owned or maintained a pool before. After some searching I found a company to prep my site. The location is extremely unlevel and in fact a low spot in my yard. 2/3 of the pool will be about 20 inches below the yard. I'd planned on having the company to level a 18' circle for me to place the pool. They will also provide 4 inches of sand and level.
Questions.
1. I bought 4x8x16 pavers and not sure which direction to lay them? With this pool I don't think the supports will move much so I thought sideways with the 16" longwise? I think I read to allow one inch inside pool?
2. Do I then backfill the space on the 20" sides with dirt after filling?
Thanks in advance for any help you can give
Dave
Questions.
1. I bought 4x8x16 pavers and not sure which direction to lay them? With this pool I don't think the supports will move much so I thought sideways with the 16" longwise? I think I read to allow one inch inside pool?
2. Do I then backfill the space on the 20" sides with dirt after filling?
Thanks in advance for any help you can give
Dave