First time installing a unibead liner or a 24' AG pool for that matter. I scoured the net and followed directions to lay the liner out in the sun, install in 80 degree day and vacuum through the skimmer opening. I'm slowly filling with a garden hose @ 10 gpm to get the wrinkles out of the floor and it is filling evenly. I have roughly 3" of water in currently and will wait 3 days until a tanker arrives with 8,000 gallons (it will also be 85 degF and sunny). We seated the liner and had to shift the bottom several times yet the liner is still 4-6" away from the wall at the bottom around 2/3 of the pool. Significant pressure is exerted to push the bottom of the liner to touch the wall. Should I drain & start over? Will the liner stretch that much?