Recently had our pool installed in May. The builder initially setup a schedule for the pool to run 12 hours throughout the day (5am-5pm). The pool has been crystal clear however after reading through many posts, it seems as though my settings are extremely high. In testing the pump with the IC40, at 1600 RPM the cell reports low flow.
Would the following be a good schedule to run? If my math is correct, this should turn the pool over roughly 2.5 times within 24 hours running off peak hours.
Pool: 5am-12pm at 1800 RPM
Cleaner: 5am-7am 2400 RPM
Pool High: 7am-10am 2600 RPM
Pool: 9pm-4am 1800 RPM
Would the following be a good schedule to run? If my math is correct, this should turn the pool over roughly 2.5 times within 24 hours running off peak hours.
Pool: 5am-12pm at 1800 RPM
Cleaner: 5am-7am 2400 RPM
Pool High: 7am-10am 2600 RPM
Pool: 9pm-4am 1800 RPM
Last edited: