Adding chemicals at the same time?

TamithaSue50

Well-known member
Jun 6, 2018
184
Parkersburg, WV
I know you can't add muriatic acid with other chemicals so I'm wondering how long after adding MA do you need to wait to add other chemicals? And also not counting MA can you add other chemicals at the same time like bleach and stabilizer? If not how long should you wait between those two?

Thanks
 

mknauss

Mod Squad
TFP Expert
Bronze Supporter
May 3, 2014
22,791
Laughlin, NV
Only issue is adding acid and chlorine at the same time. Space those by 15 minutes or so, pump running. The rest of things you might add can be added simultaneously.