- Jan 3, 2023
- 344
- Pool Size
- 9500
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
I installed a peristaltic pump and the injection bill/check valve (Stenner) into my return plumbing. It is a cheaper pump and it is temporally attached to a 12v transformer plugged into a 120 type a outlet attached to my panel. I will make it more permanent and probably move up from a $15 pump down the road a bit as well as add it to a relay in the Easytouch (or just hardware the existing timer)
Currently I'm running full strength, 31.45 MA at a low flow rate of 30ml/m @ 17 minutes to get me to 18 oz I want per day trying to maintain a 7.8 PH. That's based on my average daily additions lately (doing well after some minor volume tweaks). Question - I have read in a few threads of people diluting the acid (I've seen 50/50, and 4:1) and running the pump longer to get the appropriate dose. Is there any benefit to diluting or reason to change from full strength, other than maybe a weaker solution being a bit easier on the tubing and the diluted off-gassing? I realize a dose is a dose as long as it is getting into the pool.
I haven't quite worked out the final design for storage yet but have a few ideas. right now, I've got a hole drilled in the 1gal jug with the tub stuffed in there. The injection Tee is currently after the SWCG but when I put in my last diverter valve next, I will move it to just before the unit to let that MA clean the plates. until then this is more POC
Currently I'm running full strength, 31.45 MA at a low flow rate of 30ml/m @ 17 minutes to get me to 18 oz I want per day trying to maintain a 7.8 PH. That's based on my average daily additions lately (doing well after some minor volume tweaks). Question - I have read in a few threads of people diluting the acid (I've seen 50/50, and 4:1) and running the pump longer to get the appropriate dose. Is there any benefit to diluting or reason to change from full strength, other than maybe a weaker solution being a bit easier on the tubing and the diluted off-gassing? I realize a dose is a dose as long as it is getting into the pool.
I haven't quite worked out the final design for storage yet but have a few ideas. right now, I've got a hole drilled in the 1gal jug with the tub stuffed in there. The injection Tee is currently after the SWCG but when I put in my last diverter valve next, I will move it to just before the unit to let that MA clean the plates. until then this is more POC