New Pool Build - Katy, TX

Gunite is done. Site cleanup crew is planned for tomorrow. Watering gunite twice a day has been ordered by Dr.PB, unless it rains. I guess this is the only time I prefer it rains tomorrow, after the cleanup crew of course.
281edf74d49047e84aa62f4b00df7176.jpg
c2e750b984e5ef1872fdab8f35ac59dd.jpg
9000c04931a1a95479f5d7c6fb84c242.jpg
68620dda0fb9dc1d8223d43dbcb4c45f.jpg


Not sure why on this picture the deep end bench looks like a small slide, in reality it is a bench and it is leveled.
ebf1094e4f54aa471cfe9db6754a53ac.jpg

9cce17e979ab273f1265f5d6e8d64ba3.jpg
 
Oops, you beat me with the send button. I see he is finished at least for today. That is amazing! I've never seen the spa done that way either. It keeps everything flowing. Ya'll have to be thrilled! Is it Modern Method doing the gunite and rocks/spa? Or is the guy doing the carving contracted separately? Fascinating! Thanks so much for sharing. Suz.
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thanks. I keep my excitment to a minimum, too many things to worry about before it's done. I am glad my PB is always available to come by and explain everything, as well as monitor the crews.

Sent from my SGH-M919 using Tapatalk
 
I have one of those sprinklers, but I don't think we need that much water and it will not cover the whole area.

The day was fun, but it's a bit stressful too because I and my DW want to make sure that what is created is what we want.

Sent from my SGH-M919 using Tapatalk
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.