It ended up right at 78K for additional stamped concrete and rocks for grotto. . The 134K was the original bid. I don't think he will build another one that cheap according to him.
Honestly, I think you got a steal...!waterworx said:It ended up right at 78K for additional stamped concrete and rocks for grotto. . The 134K was the original bid. I don't think he will build another one that cheap according to him.
Cale said:Sorry if I missed it but what kind of rock is your grotto made out of?