Renovatiing 20X40
Quote 1 $22700
Liner, coping, 2 skimmers 4 returns, main drain, removal of 1200 sq ft concrete, pour new brushed finish, deck drainage. options( stamped 1200 extra cantelever 1500)
Quote 2 22000
Liner coping 2 skimmers 4 returns(no main drain) removal of concretes pour new, drainage, vermiculite sand bottom and 4 trucks of water. options (1-2 dollars per sq for stamped)
So similar priced but second quote includes water and vermiculite although no main drain. Whats more important upgrading the sand bottom or a main drain? Have rled out wedding cake steps under liner due to concerns of wrinkles leaks etc. Thanks for any info you can provide. Anyone have cantelever or stamped in cold climates? does it hold up well?
Quote 1 $22700
Liner, coping, 2 skimmers 4 returns, main drain, removal of 1200 sq ft concrete, pour new brushed finish, deck drainage. options( stamped 1200 extra cantelever 1500)
Quote 2 22000
Liner coping 2 skimmers 4 returns(no main drain) removal of concretes pour new, drainage, vermiculite sand bottom and 4 trucks of water. options (1-2 dollars per sq for stamped)
So similar priced but second quote includes water and vermiculite although no main drain. Whats more important upgrading the sand bottom or a main drain? Have rled out wedding cake steps under liner due to concerns of wrinkles leaks etc. Thanks for any info you can provide. Anyone have cantelever or stamped in cold climates? does it hold up well?