I was on my PB's schedule to begin digging the excavation for our pool this week, but today we hit our first snag. It appears that my gas line currently runs through where the deep end of our pool is going to be, so I call the PB and he says to call the gas company so they can do a re-route of the gas line. the gas co. says it could be 3-5 days before someone will even call me back to schedule it. Man, what a let down!
Anybody else have a similar experience?
SPECS:
~15,000 free form gunite w/midnight blue PT
beach entry w/bubbler and white pearl PT
flagstone coping w/ 6" tile water line
stamped concrete deck ~625 sq. ft.
Intelliflo 4x160 pump
Intellichlor SWG
Pentair cartridge 420 sq. ft.
Mastertemp 400K BTU heater
Legend Platinum cleaner
Anybody else have a similar experience?
SPECS:
~15,000 free form gunite w/midnight blue PT
beach entry w/bubbler and white pearl PT
flagstone coping w/ 6" tile water line
stamped concrete deck ~625 sq. ft.
Intelliflo 4x160 pump
Intellichlor SWG
Pentair cartridge 420 sq. ft.
Mastertemp 400K BTU heater
Legend Platinum cleaner