I’ve done a lot of reading here but this is my first post. I greatly appreciate the huge amount of info on this forum and have learned a ton over the last year of reading.
Last year we had a 15’ intex inflatable top ring pool we used to See if the kids used it and what we thought of having a pool. They were in it every day all summer long! This year we decided to get a real pool that was larger and could just stay up..... then Covid happened and it was very difficult/impossible to find a pool.
We ordered one in May, and just got The pool delivered this weekend!
We went with a Carvin Gold series Whitewood. 24’ round with 52” wall.
Started the install and didn’t get done nearly as much as we had hoped in the first weekend, but it was also almost 100 degrees.
I got the pool area leveled (I had dug it out previously after ordering the pool) and the 150’ electrical trench dug, conduit installed.
My wife got very frustrated with how much work it has been so far, and we haven’t started putting up the pool yet. We thought about hiring someone to erect the pool at this point but everyone in area is so backed up, we haven’t been able to find anyone.


The posts around the dug out area are for retaining wall If anyone is wondering.
Last year we had a 15’ intex inflatable top ring pool we used to See if the kids used it and what we thought of having a pool. They were in it every day all summer long! This year we decided to get a real pool that was larger and could just stay up..... then Covid happened and it was very difficult/impossible to find a pool.
We ordered one in May, and just got The pool delivered this weekend!
We went with a Carvin Gold series Whitewood. 24’ round with 52” wall.
Started the install and didn’t get done nearly as much as we had hoped in the first weekend, but it was also almost 100 degrees.
I got the pool area leveled (I had dug it out previously after ordering the pool) and the 150’ electrical trench dug, conduit installed.
My wife got very frustrated with how much work it has been so far, and we haven’t started putting up the pool yet. We thought about hiring someone to erect the pool at this point but everyone in area is so backed up, we haven’t been able to find anyone.


The posts around the dug out area are for retaining wall If anyone is wondering.