My new 3050 arrived today. It talks of minimum 10" straight pipe from suction side before any 90's are added. ALso, the pump takes 2" pipe.
I have 1.5" pipe buried under concrete connected directly to a 90 on a 20 year old leaking Marlow pump.
What's my best option for plumbing the new 3050 ? Moving everything ?
Should I reduce to 1.5" at the pump, or run min. 10" @ 2" first ,before reducing? (on suction side)
Thanks in advance.
I have 1.5" pipe buried under concrete connected directly to a 90 on a 20 year old leaking Marlow pump.
What's my best option for plumbing the new 3050 ? Moving everything ?
Should I reduce to 1.5" at the pump, or run min. 10" @ 2" first ,before reducing? (on suction side)
Thanks in advance.