I have a 30gal pool from the 1950s that hasn't been touched much since then. (Maybe it was resurfaced in the 70s or 80s?) We have to resurface it because the lining is totally gone. We will also have to split the main drain and bring the light up to code. My big question is weather we should replumb/repipe the whole pool. This would be significant added cost because it would mean that we have to demo and replace all of the concrete. The piping is definitely original galvanized pipe with only one return line in the deep end (Seems like there used to be two in the deep end but one has been plugged up.) We recently replaced our DE filter and pump so those are good as is. If we replumb we would consider adding a heater or salt system. Would love to hear your opinions.
Attachments
Last edited: