2 man crew showed up at 7am today (Sunday, sorry neighbors!) to prep for plaster this week. Looks like they just scraped everything down, chipped a little away from the main drain and then pressure washed everything really good. They also drilled 2 holes in our tanning ledge for umbrella sleeves. Plaster and fill is supposed to be on Thursday but we’ll see, the auto cover company need to come reinstall the track that they had to take off to fix the coping and the electrician has to come wire the light since they couldn’t do that last time because it was full of water. After that they just need to install the stone autocover lid and the actual cover and final grade and we’ll be DONE.