Great site here. I have been reading up and trying to absorb as much info as a new pool owner.
Spool was completed two weeks ago (details in signature) and I have been following the start up procedures described in the forum:
PH levels seem to finally be leveling off, first 10 days PH would always be darker than the 8.2 reading and I have been adding liquid chlorine daily (10%). I have read different suggestions about when its ok to start using Chlorine tablets, some sites say wait 30 days, other say two weeks. Just looking to see what others here suggest.
Thank you.
Spool was completed two weeks ago (details in signature) and I have been following the start up procedures described in the forum:
- Pool Builder added sequestering agent on initial fill
- Brushing twice a day for the past two weeks
- Maintaining PH and Chlorine levels (testing daily)
- Checking Alkalinity and Calcium Hardness levels (in correct range)
PH levels seem to finally be leveling off, first 10 days PH would always be darker than the 8.2 reading and I have been adding liquid chlorine daily (10%). I have read different suggestions about when its ok to start using Chlorine tablets, some sites say wait 30 days, other say two weeks. Just looking to see what others here suggest.