- Mar 20, 2009
- 3
I love this site, very helpful.
Getting estimates for a remodel (texas, 25 year old inground plaster, 25,000 gal, 120 perimeter) and while the waterline tile will be chipped out and replaced, the bids mention that the swim lane tile, spa & pool steps tile will be covered with plaster and new tiled laid on top.
Is that normal for a remodel? Seems like a recipe for a future problem, how thick is the new plaster coat?
Thanks for any insight.
Getting estimates for a remodel (texas, 25 year old inground plaster, 25,000 gal, 120 perimeter) and while the waterline tile will be chipped out and replaced, the bids mention that the swim lane tile, spa & pool steps tile will be covered with plaster and new tiled laid on top.
Is that normal for a remodel? Seems like a recipe for a future problem, how thick is the new plaster coat?
Thanks for any insight.