GENERAL SPECIFICATIONS:
Pool Dimensions 35’ x 21’ Interior
Pool Perimeter 112 linear feet
Pool Surface Area 567 square feet
Pool Depth – 3’6” – 6’0”
Benches 16 linear feet
Steps – 28 linear feet
Sun Shelf – 84 square feet
Spa Dimensions 7’ x 7’ level with pool beam
Spa Perimeter – 28 linear feet
Surface Area – 49 square feet
Depth – 3’6”
Tile dam wall, $10/ft allowance
Total Gallons – 19,100 (adjusted for sun shelf & benches)
APPROVALS – Phase One
City permit – All fees and inspections included (if applicable)
Insurance – Two million dollars General Liability Insurance
Layout – Pool design will be marked in the yard for homeowner and city approval prior
to excavation
EXCAVATION – Phase Two
Fence – Removal of fence as needed
Rock – Complete rock excavation included
Materials – All excavated material will be hauled away unless specified
STEEL – Phase Three
Pool Shell – 1/2” steel on 10” centers, both ways or per engineered plans (if applicable)
Pool Bond Beam – 1⁄2” four bar beam
Alternate Stress Bars – as needed
PLUMBING – Phase Four
Pool pipes –Schedule 40 PVC
4 – 6 directional inlets, depending on pool design & environmental issues
Pool Skimmers – Two Pentair independently plumbed for optimum control
Pool Drains – Two VGB compliant Anti-Vortex
Spa Pipes – up to 3” suction
Spa Jets – six standard jets with rotating returns
Auto Fill Line with Dedicated RPZ Valve
Cleaner Line – one independently plumbed to 3⁄4 HP booster pump
ELECTRICAL – Phase Five
Complete electrical connection of all equipment and lighting
Includes all in-ground service with all terminations, grounding, bonding & mechanical installation
All electrical shall meet local and national standards including ground fault interrupters
Lighting and equipment is bonded and grounded for safety
Safety inspections included
GUNITE – Phase Six
Concrete – dry mix gunite rated to exceed APSP building standards
12” bond beam, 8” – 10” floors
All above grade walls to be 12”
All exposed gunite and concrete to be underpinned
TILE & COPING – Phase Seven
Pool tile – 6” frostproof band at waterline
Allowance - $10 per SF
Pool coping – saw cut limestone
DECK – Phase Eight
Reinforcement – 1⁄2” Rebar on 10” centers both ways
Deck material– 1,150 sf of spray deck
Demo & remove existing patio
Turndown beam – 270 SF
Drainage pipes – as needed
16 LF of limestone steps
62 LF of raised planters with chopped limestone fascia
Includes limestone screen wall for AC unit 8’ x 4’ tall
PLASTER – Phase Nine
Pool & Spa interior – custom mix mini pebble level 1
CLEAN UP – Phase Ten
Complete job site clean up
POOL SCHOOL – Phase Eleven
Pool Builder *edit* will provide a complete pool side Pool School to instruct the homeowner on the
proper maintenance of the pool
EQUIPMENT
Filter pump – Pentair Intelliflo 3HP variable speed
Filter – Pentair DE FNS
Filter valve – Pentair 2” multiport
Cleaner – Pentair Racer with 3⁄4 HP booster pump
Automation – Pentair Screen Logic Bundle for mobile devices
Sanitizer – Rainbow 320 automatic chlorinator
Pool lights – two (white) Pentair Intellibrite 5g LEDs
Spa light – one (white) Pentair Intellibrite 5g LED
Spa Heater – Aqua Comfort electric heat pump
Valves – premium brand valves
Maintenance equipment – 16’ telescopic pole, vacuum head and hose, 18” brush, net & test kit
WARRANTY
Pool shell – lifetime
Plaster – Lifetime on mini pebble
Pentair equipment – three year manufacturer’s on part & labor
Plumbing – three years
Electrical – three years
Sanitizers – Two years
BY OTHERS/HOMEOWNER
Reroute sprinklers and utility lines if required
Pool barrier (fence) unless otherwise specified
Door and window alarms, if required (2017 UL Certified)
Landscaping, grass
Upgrade or modify existing electrical or gas meter (service)
Gutters and drains
Water supply for filling of pool and for construction use
Supply accurate property survey sealed by land surveyor (any additional surveys, fees or
engineering that is required by City, HOA or MUD, will be homeowner’s responsibility.)
Upgrade fence, gate, latches, railings & alarms to pool code
PRICING (All prices valid for 30 days)
$112,800
OPTIONS
Cabana/Kitchen – 23’ x 14’ cedar construction, T-111 cedar ceiling, electrical hook up for
fan, 12’6” outdoor kitchen with two electrical outlets, 20 LF raised benches +$46,100
Water Sheer Wall – raised 12” – 18” tall x 37’, chopped limestone fascia, one 18” water
sheer, electric actuator for water control +$2,800
Deck upgrade to travertine, level 1 +$13,200
Pool Dimensions 35’ x 21’ Interior
Pool Perimeter 112 linear feet
Pool Surface Area 567 square feet
Pool Depth – 3’6” – 6’0”
Benches 16 linear feet
Steps – 28 linear feet
Sun Shelf – 84 square feet
Spa Dimensions 7’ x 7’ level with pool beam
Spa Perimeter – 28 linear feet
Surface Area – 49 square feet
Depth – 3’6”
Tile dam wall, $10/ft allowance
Total Gallons – 19,100 (adjusted for sun shelf & benches)
APPROVALS – Phase One
City permit – All fees and inspections included (if applicable)
Insurance – Two million dollars General Liability Insurance
Layout – Pool design will be marked in the yard for homeowner and city approval prior
to excavation
EXCAVATION – Phase Two
Fence – Removal of fence as needed
Rock – Complete rock excavation included
Materials – All excavated material will be hauled away unless specified
STEEL – Phase Three
Pool Shell – 1/2” steel on 10” centers, both ways or per engineered plans (if applicable)
Pool Bond Beam – 1⁄2” four bar beam
Alternate Stress Bars – as needed
PLUMBING – Phase Four
Pool pipes –Schedule 40 PVC
4 – 6 directional inlets, depending on pool design & environmental issues
Pool Skimmers – Two Pentair independently plumbed for optimum control
Pool Drains – Two VGB compliant Anti-Vortex
Spa Pipes – up to 3” suction
Spa Jets – six standard jets with rotating returns
Auto Fill Line with Dedicated RPZ Valve
Cleaner Line – one independently plumbed to 3⁄4 HP booster pump
ELECTRICAL – Phase Five
Complete electrical connection of all equipment and lighting
Includes all in-ground service with all terminations, grounding, bonding & mechanical installation
All electrical shall meet local and national standards including ground fault interrupters
Lighting and equipment is bonded and grounded for safety
Safety inspections included
GUNITE – Phase Six
Concrete – dry mix gunite rated to exceed APSP building standards
12” bond beam, 8” – 10” floors
All above grade walls to be 12”
All exposed gunite and concrete to be underpinned
TILE & COPING – Phase Seven
Pool tile – 6” frostproof band at waterline
Allowance - $10 per SF
Pool coping – saw cut limestone
DECK – Phase Eight
Reinforcement – 1⁄2” Rebar on 10” centers both ways
Deck material– 1,150 sf of spray deck
Demo & remove existing patio
Turndown beam – 270 SF
Drainage pipes – as needed
16 LF of limestone steps
62 LF of raised planters with chopped limestone fascia
Includes limestone screen wall for AC unit 8’ x 4’ tall
PLASTER – Phase Nine
Pool & Spa interior – custom mix mini pebble level 1
CLEAN UP – Phase Ten
Complete job site clean up
POOL SCHOOL – Phase Eleven
Pool Builder *edit* will provide a complete pool side Pool School to instruct the homeowner on the
proper maintenance of the pool
EQUIPMENT
Filter pump – Pentair Intelliflo 3HP variable speed
Filter – Pentair DE FNS
Filter valve – Pentair 2” multiport
Cleaner – Pentair Racer with 3⁄4 HP booster pump
Automation – Pentair Screen Logic Bundle for mobile devices
Sanitizer – Rainbow 320 automatic chlorinator
Pool lights – two (white) Pentair Intellibrite 5g LEDs
Spa light – one (white) Pentair Intellibrite 5g LED
Spa Heater – Aqua Comfort electric heat pump
Valves – premium brand valves
Maintenance equipment – 16’ telescopic pole, vacuum head and hose, 18” brush, net & test kit
WARRANTY
Pool shell – lifetime
Plaster – Lifetime on mini pebble
Pentair equipment – three year manufacturer’s on part & labor
Plumbing – three years
Electrical – three years
Sanitizers – Two years
BY OTHERS/HOMEOWNER
Reroute sprinklers and utility lines if required
Pool barrier (fence) unless otherwise specified
Door and window alarms, if required (2017 UL Certified)
Landscaping, grass
Upgrade or modify existing electrical or gas meter (service)
Gutters and drains
Water supply for filling of pool and for construction use
Supply accurate property survey sealed by land surveyor (any additional surveys, fees or
engineering that is required by City, HOA or MUD, will be homeowner’s responsibility.)
Upgrade fence, gate, latches, railings & alarms to pool code
PRICING (All prices valid for 30 days)
$112,800
OPTIONS
Cabana/Kitchen – 23’ x 14’ cedar construction, T-111 cedar ceiling, electrical hook up for
fan, 12’6” outdoor kitchen with two electrical outlets, 20 LF raised benches +$46,100
Water Sheer Wall – raised 12” – 18” tall x 37’, chopped limestone fascia, one 18” water
sheer, electric actuator for water control +$2,800
Deck upgrade to travertine, level 1 +$13,200