Hello to all,
They dug thursday, re-bared and did plumbing fri & sat. From one of the cut irrigation lines, residual water flowed back into the spa area and then in the lowest of the pool area. they placed mutiple pieces of 4' x 8' paneling board 3/8" thick on the dirt, then rebar'ed over them. Does this matter when they gunite?
Thanks and i'll try to get the pictures going.
Regards,
tstex
They dug thursday, re-bared and did plumbing fri & sat. From one of the cut irrigation lines, residual water flowed back into the spa area and then in the lowest of the pool area. they placed mutiple pieces of 4' x 8' paneling board 3/8" thick on the dirt, then rebar'ed over them. Does this matter when they gunite?
Thanks and i'll try to get the pictures going.
Regards,
tstex