I got a little overzealous while tightening the slip nut on the salt cell and it ended up cracking all the way around and is now leaking substantially. I have a new Hayward union due to arrive today.
It is extremely cramped down there, not just for this repair but also for any sort of maintenance. The cell nuts are at most 1/2" off the concrete and difficult to get to. I am willing to try to make a repair with the existing configuration but am open to replumbing everything between the heater (on the left) and the exit point from the shed (bottom right) to make things more convenient.
I'm looking for some feedback on 1) the best place to make a cut to reconstruct the piping after the salt cell and/or 2) a better overall layout that includes moving the cell elsewhere.
Thanks!


It is extremely cramped down there, not just for this repair but also for any sort of maintenance. The cell nuts are at most 1/2" off the concrete and difficult to get to. I am willing to try to make a repair with the existing configuration but am open to replumbing everything between the heater (on the left) and the exit point from the shed (bottom right) to make things more convenient.
I'm looking for some feedback on 1) the best place to make a cut to reconstruct the piping after the salt cell and/or 2) a better overall layout that includes moving the cell elsewhere.
Thanks!