I have a sub-panel outside that powers:
Main Pump
Water fountain boost pump
Vacuum boost pump
Slide boost pump
Heater
Landscape lighting
Pool light
Trying to add a 104 timer for the SWG since I have a VS pump.
The breaker box does not have a direct shutoff, the power shutoff i guess is in...